Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Commercial printing (except screen and books)
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0306 #08 Y:2026 Install occupancy sensors $5,800 $22,300
UU0306 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,739 $5,440
UU0306 #06 Y:2026 Improve air circulation with destratification fans / other methods $3,850 $12,000
UU0306 #05 Y:2026 Eliminate or reduce compressed air usage $540 $2,160
UU0306 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,907 $950
UU0306 #03 Y:2026 Use / purchase optimum sized compressor $10,490 $100,000
UU0306 #02 Y:2026 Turn off equipment when not in use $1,630 $4,800
UU0306 #01 Y:2026 Use solar heat to make electricty $48,160 $218,583
UU0166 #07 Y:2020 Reschedule and rearrange multiple-source heating systems $443 $300
UU0166 #06 Y:2020 Reduce the pressure of compressed air to the minimum required $912 $100
UU0166 #05 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $1,409 $600
UU0166 #04 Y:2020 Reschedule plant operations or reduce load to avoid peaks $2,448 $1,660
UU0166 #03 Y:2020 Use cooling tower or economizer to replace chiller cooling $5,545 $1,200
UU0166 #02 Y:2020 Utilize higher efficiency lamps and/or ballasts $14,704 $52,483
UU0166 #01 Y:2020 Modify facility to avoid excess maintenance costs $18,960 $212,180
UU0092 #05 Y:2005 Install compressor air intakes in coolest locations $740 $280
UU0092 #04 Y:2005 Use photocell controls $1,130 $1,800
UU0092 #03 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $3,083 $3,270
UU0092 #02 Y:2005 Install vinyl strip / high speed / air curtain doors $5,250 $19,000
UU0092 #01 Y:2005 Use soy or water-based inks $28,070 $20,000