58
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0293 #04 Y:2004 | 04 | 2004 | Utilize higher efficiency lamps and/or ballasts | $2,131 | $2,418 | n/a |
| NC0293 #03 Y:2004 | 03 | 2004 | Re-arrange equipment layout to reduce handling costs | $3,750 | $5,400 | n/a |
| NC0293 #02 Y:2004 | 02 | 2004 | Recycle air for heating, ventilation and air conditioning | $4,884 | $6,553 | n/a |
| NC0293 #01 Y:2004 | 01 | 2004 | Use waste heat from hot flue gases to preheat | $9,068 | $23,100 | n/a |
| WV0283 #14 Y:2003 | 14 | 2003 | Reduce illumination to minimum necessary levels | $493 | $860 | |
| WV0283 #13 Y:2003 | 13 | 2003 | Utilize higher efficiency lamps and/or ballasts | $633 | $1,830 | |
| WV0283 #12 Y:2003 | 12 | 2003 | Install compressor air intakes in coolest locations | $739 | $295 | |
| WV0283 #11 Y:2003 | 11 | 2003 | Utilize higher efficiency lamps and/or ballasts | $764 | - | |
| WV0283 #10 Y:2003 | 10 | 2003 | Utilize a less expensive cooling method | $1,509 | $1,338 | |
| WV0283 #09 Y:2003 | 09 | 2003 | Use synthetic lubricant | $2,247 | $2,020 | |
| WV0283 #08 Y:2003 | 08 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $3,561 | $1,416 | |
| WV0283 #07 Y:2003 | 07 | 2003 | Reduce the pressure of compressed air to the minimum required | $3,923 | $86 | |
| WV0283 #06 Y:2003 | 06 | 2003 | Use adjustable frequency drive or multiple speed motors on existing system | $4,222 | $6,500 | |
| WV0283 #05 Y:2003 | 05 | 2003 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $4,643 | $1,290 | |
| WV0283 #04 Y:2003 | 04 | 2003 | Utilize a less expensive cooling method | $4,877 | $100,430 | |
| WV0283 #03 Y:2003 | 03 | 2003 | Chill water to the highest temperature possible | $6,964 | $86 | |
| WV0283 #02 Y:2003 | 02 | 2003 | Reschedule plant operations or reduce load to avoid peaks | $9,827 | $5,000 | |
| WV0283 #01 Y:2003 | 01 | 2003 | Adjust burners for efficient operation | $11,512 | $250 |