ITAC Assessment: WV0283
ITAC logo
ITAC Assessment: WV0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Printed Periodicals
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 70,000
ft2
Annual Production 0
lb
Production Hrs. Annual 7,488
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,951 4,679,280
kWh
Electricity Demand $145,368 14,102
kW-mo/yr
Natural Gas $115,636 11,560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,914 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,493

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1133: Adjust burners for efficient operation $11,512 $250 $8,188
361,808
kWh
$3,324
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,827 $5,000 - $9,827
-
kW-mo/yr
- -
03 2.2625: Chill water to the highest temperature possible $6,964 $86 $4,953
219,019
kWh
$2,011
-
kW-mo/yr
- -
04 2.2628: Utilize a less expensive cooling method $4,877 $100,430 $2,692
118,964
kWh
$2,185
-
kW-mo/yr
- -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $4,643 $1,290 $4,039
178,144
kWh
$1,636
-
kW-mo/yr
- $(-1,032.0)
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,222 $6,500 $1,591
70,320
kWh
$2,631
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,923 $86 $2,791
123,228
kWh
$1,132
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,561 $1,416 $2,533
111,926
kWh
$1,028
-
kW-mo/yr
- -
09 2.4314: Use synthetic lubricant $2,247 $2,020 - - $2,247
-
MMBtu
-
10 2.2628: Utilize a less expensive cooling method $1,509 $1,338 $1,074
47,390
kWh
$435
-
kW-mo/yr
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $764 - $544
24,052
kWh
$220
-
kW-mo/yr
- -
12 2.4221: Install compressor air intakes in coolest locations $739 $295 $526
23,226
kWh
$213
-
kW-mo/yr
- -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $633 $1,830 $524
23,296
kWh
$109
-
kW-mo/yr
- -
14 2.7111: Reduce illumination to minimum necessary levels $493 $860 $206
9,208
kWh
$287
-
kW-mo/yr
- -
TOTAL RECOMMENDED $55,914 $121,401 $29,661
1,310,581
kWh
$25,038
-
kW-mo/yr
$2,247
-
MMBtu
$(-1,032.0)
TOTAL IMPLEMENTED $32,493 $5,818 $23,778
1,050,681
kWh
$9,747
-
kW-mo/yr
- $(-1,032.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs