Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,994

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Printing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0133 #06 Y:2026 Isolate hot or cold equipment $29 $86
NL0133 #05 Y:2026 Close holes and openings in building such as broken windows $331 $261
NL0133 #04 Y:2026 Utilize energy-efficient belts and other improved mechanisms $412 $107
NL0133 #03 Y:2026 Install occupancy sensors $1,518 $1,581
NL0133 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $6,536 $5,000
NL0133 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $19,221 $56,574
SD0693 #10 Y:2026 Use heat pump for space conditioning $74,010 $21,175
SD0693 #09 Y:2026 Recharge batteries on during off-peak demand periods $14,692 -
SD0693 #08 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $45,060 $11,400
SD0693 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $396 $1,694
SD0693 #06 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $3,872 $4,600
SD0693 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,121 $3,568
SD0693 #04 Y:2026 Use most efficient type of electric motors $55,458 $67,347
SD0693 #03 Y:2026 Use battery storage for demand control $172,708 $85,941
SD0693 #02 Y:2026 Use solar heat to make electricty $190,274 $384,556
SD0693 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $2,232 -
SD0691 #09 Y:2026 Install compressor air intakes in coolest locations $19,376 $4,825
SD0691 #08 Y:2026 Use heat pump for space conditioning $15,399 $29,800
SD0691 #07 Y:2026 Reduce the pressure of compressed air to the minimum required $1,161 -
SD0691 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $64 $169