Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,024

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Printing and related support activities
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0471 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $921 $1,747
MI0471 #06 Y:2025 Insulate bare equipment $212 $346
MI0471 #05 Y:2025 Close holes and openings in building such as broken windows $269 $389
MI0471 #04 Y:2025 Install vinyl strip / high speed / air curtain doors $13,010 $13,222
MI0471 #03 Y:2025 Optimize plant power factor $7,230 $7,058
MI0471 #02 Y:2025 Install occupancy sensors $1,132 $703
MI0471 #01 Y:2025 Change rate schedules or other changes in utility service $1,896 $104
WM0250 #10 Y:2025 Utilize energy-efficient belts and other improved mechanisms $544 $180
WM0250 #09 Y:2025 Recharge batteries on during off-peak demand periods $849 $1,650
WM0250 #08 Y:2025 Lower temperature during the winter season and vice-versa $1,178 -
WM0250 #07 Y:2025 Use compressor air filters $1,631 $5,051
WM0250 #06 Y:2025 Reduce space conditioning during non-working hours $2,100 $2,950
WM0250 #05 Y:2025 Install compressor air intakes in coolest locations $2,115 $1,677
WM0250 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $3,625 -
WM0250 #03 Y:2025 Use optimum size and capacity equipment $5,151 $9,394
WM0250 #02 Y:2025 Combine utility meters $5,563 -
WM0250 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $5,874 -
CI0060 #10 Y:2025 Install occupancy sensors $2,031 $900
CI0060 #09 Y:2025 Use most efficient type of electric motors $2,901 $860
CI0060 #08 Y:2025 Insulate bare equipment $4,042 $6,250