165
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
WM0241 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $96 | $368 |
n/a
|
WM0241 #04 Y:2025 | 04 | 2025 | Re-use or recycle hot or cold process exhaust air | $552 | $635 |
n/a
|
WM0241 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,471 | $2,249 |
n/a
|
WM0241 #02 Y:2025 | 02 | 2025 | Close holes and openings in building such as broken windows | $1,959 | $6,000 |
n/a
|
WM0241 #01 Y:2025 | 01 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $25,950 | - |
n/a
|
MS0412 #04 Y:2023 | 04 | 2023 | Use solar heat to make electricty | $10,030 | $96,425 |
n/a
|
MS0412 #03 Y:2023 | 03 | 2023 | Lower temperature during the winter season and vice-versa | $108 | - |
n/a
|
MS0412 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $6,039 | $17,808 |
n/a
|
MS0412 #01 Y:2023 | 01 | 2023 | Install occupancy sensors | $3,382 | $1,476 |
n/a
|
LE0469 #05 Y:2018 | 05 | 2018 | Utilize higher efficiency lamps and/or ballasts | $10,425 | $18,125 | |
LE0469 #04 Y:2018 | 04 | 2018 | Replace existing hvac unit with high efficiency model | $18,723 | $23,000 | |
LE0469 #03 Y:2018 | 03 | 2018 | Recover waste heat from equipment | $5,321 | $6,000 | |
LE0469 #02 Y:2018 | 02 | 2018 | Utilize energy-efficient belts and other improved mechanisms | $159 | $175 | |
LE0469 #01 Y:2018 | 01 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,507 | $1,000 | |
AS0455 #07 Y:2018 | 07 | 2018 | Pay bills on time to avoid late fees | $15,576 | - | |
AS0455 #06 Y:2018 | 06 | 2018 | Modify process to reduce material use/cost | $1,556 | - | |
AS0455 #05 Y:2018 | 05 | 2018 | Add equipment/ operators to reduce production bottleneck | $114,480 | $30,000 | |
AS0455 #04 Y:2018 | 04 | 2018 | Utilize higher efficiency lamps and/or ballasts | $10,551 | $12,598 | |
AS0455 #03 Y:2018 | 03 | 2018 | Use most efficient type of electric motors | $18,097 | $36,012 | |
AS0455 #02 Y:2018 | 02 | 2018 | Reduce the pressure of compressed air to the minimum required | $6,768 | $800 |