Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Corrugated and solid fiber box manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0581 #08 Y:2016 Develop a repair/replace policy $2,508 $5,865
NC0581 #07 Y:2016 Burn waste oil for heat $1,336 $5,400
NC0581 #06 Y:2016 Recycle air for heating, ventilation and air conditioning $8,569 $25,000
NC0581 #05 Y:2016 Reduce the pressure of compressed air to the minimum required $4,139 $3,000
NC0581 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $155 $200
NC0581 #03 Y:2016 Use photocell controls $1,319 $1,000
NC0581 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $14,986 $45,747
NC0581 #01 Y:2016 Change rate schedules or other changes in utility service $20,175 $500
NC0384 #07 Y:2008 Utilize higher efficiency lamps and/or ballasts $1,112 $500
NC0384 #06 Y:2008 Utilize higher efficiency lamps and/or ballasts $4,272 $5,000
NC0384 #05 Y:2008 Install / repair insulation on steam lines $1,068 $271
NC0384 #04 Y:2008 Develop a repair/replace policy $1,428 $3,142
NC0384 #03 Y:2008 Reduce the pressure of compressed air to the minimum required $3,929 $7,700
NC0384 #02 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $3,352 $100
NC0384 #01 Y:2008 Recover waste heat from equipment $10,481 $5,000
NC0341 #06 Y:2006 Develop standard operating procedures $55,756 $2,540
NC0341 #05 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $353 $100
NC0341 #04 Y:2006 Develop a repair/replace policy $1,455 $929
NC0341 #03 Y:2006 Disconnect ballasts $1,454 $1,650
NC0341 #02 Y:2006 Turn off equipment when not in use $9,082 $100