ITAC Assessment: NC0341
ITAC logo
ITAC Assessment: NC0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Corrugated packaging
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2670:
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 300,000
thousand feet
Production Hrs. Annual 4,800
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,277 1,174,800
kWh
Electricity Demand $28,231 3,361
kW-mo/yr
Electricity Fees $3,654 -
Natural Gas $69,759 5,402
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7313: Recycle air for heating, ventilation and air conditioning $11,414 $25,000 - - $11,414
-
MMBtu
- - -
02 2.6218: Turn off equipment when not in use $9,082 $100 $4,341
107,973
kWh
- $4,741
-
MMBtu
- - -
03 2.7122: Disconnect ballasts $1,454 $1,650 $955
23,760
kWh
$499
-
kW-mo/yr
- - - -
04 2.4151: Develop a repair/replace policy $1,455 $929 $955
23,767
kWh
$500
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $353 $100 $452
11,238
kWh
$241
-
kW-mo/yr
- $(-240.0) - $(-100.0)
06 4.625: Develop standard operating procedures $55,756 $2,540 - - - $7,500 $48,256 -
TOTAL RECOMMENDED $79,514 $30,319 $6,703
166,738
kWh
$1,240
-
kW-mo/yr
$16,155
-
MMBtu
$7,260 $48,256 $(-100.0)
TOTAL IMPLEMENTED $353 $100 $452
11,238
kWh
$241
-
kW-mo/yr
- $(-240.0) - $(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs