21
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Corrugated and solid fiber box manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0340 #13 Y:2006 | 13 | 2006 | Modify process to reduce material use/cost | $61,400 | $25,000 | |
| NC0340 #12 Y:2006 | 12 | 2006 | Optimize production lot sizes and inventories | $18,650 | $20,000 | |
| NC0340 #11 Y:2006 | 11 | 2006 | Optimize production lot sizes and inventories | $20,000 | $20,000 | |
| NC0340 #10 Y:2006 | 10 | 2006 | Utilize higher efficiency lamps and/or ballasts | $1,390 | $50 | |
| NC0340 #09 Y:2006 | 09 | 2006 | Utilize higher efficiency lamps and/or ballasts | $129 | $377 | |
| NC0340 #08 Y:2006 | 08 | 2006 | Remove or close off unneeded compressed air lines | $272 | $500 | |
| NC0340 #07 Y:2006 | 07 | 2006 | Recover waste heat from equipment | $6,998 | - | |
| NC0340 #06 Y:2006 | 06 | 2006 | Reduce the pressure of compressed air to the minimum required | $1,146 | $1,700 | |
| NC0340 #05 Y:2006 | 05 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $2,698 | $7,600 | |
| NC0340 #04 Y:2006 | 04 | 2006 | Insulate feedwater tank | $879 | $220 | |
| NC0340 #03 Y:2006 | 03 | 2006 | Repair or replace steam traps | $4,704 | $1,500 | |
| NC0340 #02 Y:2006 | 02 | 2006 | Close off unneeded steam lines | $13,322 | - | |
| NC0340 #01 Y:2006 | 01 | 2006 | Adjust burners for efficient operation | $1,720 | $1,800 | |
| NC0322 #08 Y:2005 | 08 | 2005 | Utilize higher efficiency lamps and/or ballasts | $217 | $2,000 | |
| NC0322 #07 Y:2005 | 07 | 2005 | Eliminate or reduce compressed air usage | $723 | $298 | |
| NC0322 #06 Y:2005 | 06 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $462 | $100 | |
| NC0322 #05 Y:2005 | 05 | 2005 | Install / repair insulation on condensate lines | $2,592 | $821 | |
| NC0322 #04 Y:2005 | 04 | 2005 | Develop a repair/replace policy | $573 | - | |
| NC0322 #03 Y:2005 | 03 | 2005 | Add equipment/ operators to reduce production bottleneck | $74,009 | $100,000 | |
| NC0322 #02 Y:2005 | 02 | 2005 | Eliminate old stock and modify inventory control | $8,353 | $2,650 |