ITAC Assessment: NC0322
ITAC logo
ITAC Assessment: NC0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Interior packaging materials
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 125,000
ft2
Annual Production 12,500,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Virginia
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,002 1,498,400
kWh
Electricity Demand $33,836 5,166
kW-mo/yr
Electricity Fees $180 -
Natural Gas $85,623 8,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $226,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $152,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 4.431: Train operators for maximum operating efficiency $139,400 $9,500 - - - - $14,400 - $125,000 -
02 4.322: Eliminate old stock and modify inventory control $8,353 $2,650 $243
5,608
kWh
$165
-
kW-mo/yr
- $5,445
-
MMBtu
- - $2,500 -
03 4.111: Add equipment/ operators to reduce production bottleneck $74,009 $100,000 $4,328
100,000
kWh
$5,700
-
kW-mo/yr
$1,481
-
MMBtu
- - $62,500 - -
04 2.4151: Develop a repair/replace policy $573 - $309
7,152
kWh
$264
-
kW-mo/yr
- - - - - -
05 2.2122: Install / repair insulation on condensate lines $2,592 $821 - - $2,592
-
MMBtu
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $462 $100 $640
14,800
kWh
$422
-
kW-mo/yr
- - $(-300.0) - - $(-300.0)
07 2.4239: Eliminate or reduce compressed air usage $723 $298 $436
10,080
kWh
$287
-
kW-mo/yr
- - - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $217 $2,000 $131
3,017
kWh
$86
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $226,329 $115,369 $6,087
140,657
kWh
$6,924
-
kW-mo/yr
$4,073
-
MMBtu
$5,445
-
MMBtu
$14,100 $62,500 $127,500 $(-300.0)
TOTAL IMPLEMENTED $152,320 $15,369 $1,759
40,657
kWh
$1,224
-
kW-mo/yr
$2,592
-
MMBtu
$5,445
-
MMBtu
$14,100 - $127,500 $(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs