Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,483

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0263 #04 Y:2026 Reduce space conditioning during non-working hours $191 $100
WM0263 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $325 $250
WM0263 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $1,056 -
WM0263 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,080 $3,550
MI0476 #08 Y:2026 Install occupancy sensors $38 $121
MI0476 #07 Y:2026 Optimize plant power factor $8,555 $25,634
MI0476 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $345 $994
MI0476 #05 Y:2026 Close holes and openings in building such as broken windows $49 $71
MI0476 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $9,799 $1,686
MI0476 #03 Y:2026 Lower temperature during the winter season and vice-versa $461 $60
MI0476 #02 Y:2026 Change rate schedules or other changes in utility service $1,092 $104
MI0476 #01 Y:2026 Use solar heat to make electricty $73,707 $1,380
GT1012 #09 Y:2026 Use solar heat to make electricty $349,269 $2,074,730
GT1012 #08 Y:2026 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $282,619 $966,000
GT1012 #07 Y:2026 Install occupancy sensors $4,069 $9,210
GT1012 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $8,900 $14,637
GT1012 #05 Y:2026 Turn off equipment during breaks, reduce operating time $1,511 $2,210
GT1012 #04 Y:2026 Eliminate or reduce compressed air usage $10,234 $14,450
GT1012 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $7,194 $9,500
GT1012 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $86,480 $1,850