Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,435

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0301 #09 Y:2026 Use solar heat to make electricty $589,000 $19,489,000
UU0301 #08 Y:2026 Install occupancy sensors $3,980 $27,440
UU0301 #07 Y:2026 Use heat from boiler blowdown to preheat boiler feed water $4,360 $9,520
UU0301 #06 Y:2026 Install desiccant humidity control system $86,700 $86,700
UU0301 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $18,700 $11,400
UU0301 #04 Y:2026 Eliminate or reduce compressed air usage $10,800 $19,440
UU0301 #03 Y:2026 Use / purchase optimum sized compressor $51,100 $441,000
UU0301 #02 Y:2026 Use battery storage for demand control $164,000 $672,400
UU0301 #01 Y:2026 Chill water to the highest temperature possible $87,700 $282,000
AS0612 #06 Y:2026 Install occupancy sensors $207 $585
AS0612 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,245 $20,000
AS0612 #04 Y:2026 Install timers on light switches in little used areas $3,058 $1,600
AS0612 #03 Y:2026 Pay utility bills on time $39,461 $10,785
AS0612 #02 Y:2026 Add air shields to trucks to increase fuel mileage $61,388 $58,430
AS0612 #01 Y:2026 Upgrade obsolete equipment $315,000 $813,776
IC0345 #11 Y:2026 Install / repair insulation on steam lines $11,178 $2,752
IC0345 #10 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,563 $1,775
IC0345 #09 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $6,608 $10,990
IC0345 #08 Y:2026 Eliminate or reduce compressed air usage $709 $2,496
IC0345 #07 Y:2026 Use demand controller or load shedder $819 $1,912