16
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Paper (except newsprint) mills | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LL0333 #08 Y:2010 | 08 | 2010 | Conserve energy by efficient use of vending machines | $363 | $668 | |
| LL0333 #07 Y:2010 | 07 | 2010 | Install occupancy sensors | $432 | $1,020 | |
| LL0333 #06 Y:2010 | 06 | 2010 | Utilize higher efficiency lamps and/or ballasts | $611 | $4,655 | |
| LL0333 #05 Y:2010 | 05 | 2010 | Insulate bare equipment | $3,966 | $5,315 | |
| LL0333 #04 Y:2010 | 04 | 2010 | Reduce space conditioning during non-working hours | $8,177 | $540 | |
| LL0333 #03 Y:2010 | 03 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,348 | $4,720 | |
| LL0333 #02 Y:2010 | 02 | 2010 | Repair and eliminate steam leaks | $288,465 | $36,500 | |
| LL0333 #01 Y:2010 | 01 | 2010 | Preheat boiler makeup water with waste process heat | $2,585,020 | $273,500 | |
| OK0732 #08 Y:2006 | 08 | 2006 | Reduce the pressure of compressed air to the minimum required | $1,116 | $1,065 | |
| OK0732 #07 Y:2006 | 07 | 2006 | Install occupancy sensors | $685 | $685 | |
| OK0732 #06 Y:2006 | 06 | 2006 | Utilize higher efficiency lamps and/or ballasts | $3,627 | $3,627 | |
| OK0732 #05 Y:2006 | 05 | 2006 | Utilize higher efficiency lamps and/or ballasts | $1,800 | $1,241 | |
| OK0732 #04 Y:2006 | 04 | 2006 | Install / repair insulation on steam lines | $1,602 | $1,223 | |
| OK0732 #03 Y:2006 | 03 | 2006 | Preheat boiler makeup water with waste process heat | $18,843 | $17,500 | |
| OK0732 #02 Y:2006 | 02 | 2006 | Optimize plant power factor | $23,061 | $32,500 | |
| OK0732 #01 Y:2006 | 01 | 2006 | Reduce the pressure of compressed air to the minimum required | $4,149 | $2,491 |