ITAC Assessment: LL0333
ITAC logo
ITAC Assessment: LL0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 183
Plant Area 200,000
ft2
Annual Production 150,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,400,000 161,538,495
kWh
Natural Gas $13,700,000 4,500,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,899,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,877,451

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2441: Preheat boiler makeup water with waste process heat $2,585,020 $273,500 - $2,585,020
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $288,465 $36,500 - $288,465
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,348 $4,720 $12,348
237,461
kWh
-
04 2.7224: Reduce space conditioning during non-working hours $8,177 $540 $8,177
157,248
kWh
-
05 2.2511: Insulate bare equipment $3,966 $5,315 - $3,966
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $611 $4,655 $611
11,744
kWh
-
07 2.7135: Install occupancy sensors $432 $1,020 $432
8,308
kWh
-
08 2.6211: Conserve energy by efficient use of vending machines $363 $668 $363
6,989
kWh
-
TOTAL RECOMMENDED $2,899,382 $326,918 $21,931
421,750
kWh
$2,877,451
-
MMBtu
TOTAL IMPLEMENTED $2,877,451 $315,315 - $2,877,451
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs