| Assessment Year | 2006 |
|---|---|
| Principal Product | Paper |
| NAICS | 322121: Paper (except Newsprint) Mills |
| SIC | 2621: Paper Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 64 |
| Plant Area |
106,000
ft2
|
| Annual Production | 1,000,000,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $120,175 | 3,960,000 |
kWh
|
$0.030 |
| Electricity Demand | $105,048 | 10,672 |
kW-mo/yr
|
$9.84 |
| Natural Gas | $313,376 | 41,772 |
MMBtu
|
$7.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $54,883 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $31,137 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,149 | $2,491 |
$4,149
72,917
kWh
|
- | - | |
| 02 | 2.3212: Optimize plant power factor | $23,061 | $32,500 | - | $23,061 | - | |
| 03 | 2.2441: Preheat boiler makeup water with waste process heat | $18,843 | $17,500 | - | - |
$18,843
-
MMBtu
|
|
| 04 | 2.2136: Install / repair insulation on steam lines | $1,602 | $1,223 | - | - |
$1,602
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,800 | $1,241 |
$1,800
6,658
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,627 | $3,627 |
$3,627
18,720
kWh
|
- | - | |
| 07 | 2.7135: Install occupancy sensors | $685 | $685 |
$685
7,030
kWh
|
- | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,116 | $1,065 |
$1,116
19,620
kWh
|
- | - | |
| TOTAL RECOMMENDED | $54,883 | $60,332 |
$11,377
124,945
kWh
|
$23,061 |
$20,445
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $31,137 | $27,147 |
$10,692
117,915
kWh
|
- |
$20,445
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs