ITAC Assessment: OD0109
ITAC logo
ITAC Assessment: OD0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Asphalt
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 150,000
ft2
Annual Production 270,000
ton
Production Hrs. Annual 3,744
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,033 688,159
kWh
Electricity Demand $19,032 4,743
kW-mo/yr
Electricity Fees $10,004 -
Natural Gas $216,054 55,470
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,142

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $612 $1,562 $490
9,379
kWh
$122
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $1,672 $3,000 - - $1,672
-
MMBtu
-
03 3.6124: Burn waste oil for heat $3,530 $6,245 - - - $3,530
-
gal
TOTAL RECOMMENDED $5,814 $10,807 $490
9,379
kWh
$122
-
kW-mo/yr
$1,672
-
MMBtu
$3,530
-
gal
TOTAL IMPLEMENTED $4,142 $7,807 $490
9,379
kWh
$122
-
kW-mo/yr
- $3,530
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs