ITAC Assessment: UD0821
ITAC logo
ITAC Assessment: UD0821
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Medical Surgical Tools
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 561
Plant Area 69,250
ft2
Annual Production 15,989,823
units
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,002,899 15,250,715
kWh
Natural Gas $25,935 2,128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,105 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,756

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.9114: Use solar heat to make electricty $4,575 $300,000 $4,575
59,417
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,610 $25 $610
16,500
kWh
$3,000
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,331 $75 $1,831
49,500
kWh
$1,500
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $40,341 $60,300 $20,791
557,410
kWh
$16,884
-
kW-mo/yr
- $2,666
05 2.7142: Utilize higher efficiency lamps and/or ballasts $479 $893 $266
7,128
kWh
$216
-
kW-mo/yr
- $(-3.0)
06 2.2437: Recover waste heat from equipment $3,023 $4,000 - - $3,023
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,766 $25 $1,526
40,920
kWh
$1,240
-
kW-mo/yr
- -
08 2.7232: Replace existing hvac unit with high efficiency model $23,979 $43,700 $23,979
642,872
kWh
- - -
09 2.7235: Install fossil fuel make-up air unit $2,560 $5,542 - - $2,560
-
MMBtu
-
10 2.7224: Reduce space conditioning during non-working hours $1,772 $3,500 $297
7,963
kWh
- $1,475
-
MMBtu
-
11 2.7241: Install outside air damper / economizer on hvac unit $669 $400 - - $669
-
MMBtu
-
TOTAL RECOMMENDED $87,105 $418,460 $53,875
1,381,710
kWh
$22,840
-
kW-mo/yr
$7,727
-
MMBtu
$2,663
TOTAL IMPLEMENTED $74,756 $408,418 $50,518
1,291,290
kWh
$20,100
-
kW-mo/yr
$1,475
-
MMBtu
$2,663
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs