Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0425 #11 Y:2009 Contract a wood pallet recycling company $525 -
UF0425 #10 Y:2009 Use most efficient type of electric motors $59,018 $139,322
UF0425 #09 Y:2009 Repair faulty insulation in furnaces, boilers, etc $52,516 $31,860
UF0425 #08 Y:2009 Repair faulty insulation in furnaces, boilers, etc $2,702 $1,800
UF0425 #07 Y:2009 Establish a preventative maintenance program $41,811 $2,400
UF0425 #06 Y:2009 Develop a repair/replace policy $1,195 -
UF0425 #05 Y:2009 Improve air circulation with destratification fans / other methods $14,600 $12,400
UF0425 #04 Y:2009 Make a practice of turning off lights when not needed $6,908 $1,600
UF0425 #03 Y:2009 Utilize higher efficiency lamps and/or ballasts $61,944 $21,313
UF0425 #02 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $2,129 $456
UF0425 #01 Y:2009 Reduce the pressure of compressed air to the minimum required $9,286 -
UF0416 #07 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $21,708 $1,477
UF0416 #06 Y:2008 Utilize higher efficiency lamps and/or ballasts $39,189 $227,490
UF0416 #05 Y:2008 Develop a repair/replace policy $5,057 -
UF0416 #04 Y:2008 Reduce the pressure of compressed air to the minimum required $5,217 -
UF0416 #03 Y:2008 Install timers and/or thermostats $53,629 $49,236
UF0416 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $70,300 $53,500
UF0416 #01 Y:2008 Repair faulty insulation in furnaces, boilers, etc $950 $4,000