| AM0998 #08 Y:2026 | 08 | 2026 | Use solar heat to make electricty | $12,140 | $350,280 |
n/a
|
| AM0998 #07 Y:2026 | 07 | 2026 | Use / purchase optimum sized compressor | $2,050 | $13,500 |
n/a
|
| AM0998 #06 Y:2026 | 06 | 2026 | Replace treated water with well / surface water | $27,960 | $148,250 |
n/a
|
| AM0998 #05 Y:2026 | 05 | 2026 | Repair faulty insulation in furnaces, boilers, etc | $4,220 | $15,300 |
n/a
|
| AM0998 #04 Y:2026 | 04 | 2026 | Eliminate or reduce compressed air usage | $685 | $650 |
n/a
|
| AM0998 #03 Y:2026 | 03 | 2026 | Meter waste water | $9,080 | $2,650 |
n/a
|
| AM0998 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,510 | $390 |
n/a
|
| AM0998 #01 Y:2026 | 01 | 2026 | Apply for tax-free status for energy purchases | $5,250 | $2,300 |
n/a
|
| SU0598 #09 Y:2026 | 09 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $4,764 | $47,448 |
n/a
|
| SU0598 #08 Y:2026 | 08 | 2026 | Replace existing hvac unit with high efficiency model | $983 | $9,580 |
n/a
|
| SU0598 #07 Y:2026 | 07 | 2026 | Install / repair insulation on steam lines | $98 | $681 |
n/a
|
| SU0598 #06 Y:2026 | 06 | 2026 | Use closed cycle process to minimize waste water production | $2,680 | $9,976 |
n/a
|
| SU0598 #05 Y:2026 | 05 | 2026 | Utilize higher efficiency lamps and/or ballasts | $1,427 | $2,913 |
n/a
|
| SU0598 #04 Y:2026 | 04 | 2026 | Turn off equipment when not in use | $128,712 | - |
n/a
|
| SU0598 #03 Y:2026 | 03 | 2026 | Reduce the pressure of compressed air to the minimum required | $323 | - |
n/a
|
| SU0598 #02 Y:2026 | 02 | 2026 | Apply for tax-free status for energy purchases | $1,464 | - |
n/a
|
| SU0598 #01 Y:2026 | 01 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $1,443 | - |
n/a
|
| NL0132 #07 Y:2026 | 07 | 2026 | Utilize higher efficiency lamps and/or ballasts | $2,133 | $6,131 |
n/a
|
| NL0132 #06 Y:2026 | 06 | 2026 | Cover open tanks | $3,370 | $2,134 |
n/a
|
| NL0132 #05 Y:2026 | 05 | 2026 | Cover open tanks | $4,134 | $1,002 |
n/a
|