ITAC Assessment: SU0598
ITAC logo
ITAC Assessment: SU0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Pressure treated Lumber
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $50
M
to 100
M
# of Employees 69
Plant Area 292,214
ft2
Annual Production 40,000
units
Production Hrs. Annual 2,600
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,713 327,589
kWh
Electricity Demand $28,868 1,714
kW-mo/yr
Electricity Fees $1,002 -
Natural Gas $32,247 3,248
MMBtu
Fuel Oil #2 $886,444 31,247
MMBtu
Waste Disposal Costs
Water Usage $3,057 744,383
Tgal
TOTAL YEARLY COSTS $986,331
RECOMMENDED SAVINGS* $140,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,443 - - $1,443
-
kW-mo/yr
- - - -
02 2.8121: Apply for tax-free status for energy purchases $1,464 - - - - - - $1,464
03 2.4231: Reduce the pressure of compressed air to the minimum required $323 - $323
3,044
kWh
- - - - -
04 2.6218: Turn off equipment when not in use $128,721 - - - - $128,721
-
MMBtu
- -
05 3.4111: Use closed cycle process to minimize waste water production $2,751 $9,976 - - - - $2,751
-
Tgal
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,427 $5,913 $340
3,203
kWh
$1,245
-
kW-mo/yr
- - - $(-157.6)
07 2.2136: Install / repair insulation on steam lines $98 $681 - - $98
-
MMBtu
- - -
08 2.7232: Replace existing hvac unit with high efficiency model $983 $9,580 $983
9,272
kWh
- - - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,540 $47,448 $3,540
33,394
kWh
- - - - -
TOTAL RECOMMENDED $140,750 $73,597 $5,185
48,913
kWh
$2,688
-
kW-mo/yr
$98
-
MMBtu
$128,721
-
MMBtu
$2,751
-
Tgal
$1,306
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs