Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

414

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Apparel manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0167 #10 Y:2016 Recover heat from exhausted steam, hot air or hot water $816 $4,560
DL0167 #09 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $8,556 $36,400
DL0167 #08 Y:2016 Recover waste heat from equipment $40,226 $107,360
DL0167 #07 Y:2016 Recover heat from exhausted steam, hot air or hot water $33,048 $85,000
DL0167 #06 Y:2016 Use waste heat from hot flue gases to preheat $8,529 $21,200
DL0167 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $6,000 $13,010
DL0167 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $2,603 $5,470
DL0167 #03 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $2,405 $3,610
DL0167 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $11,895 $16,550
DL0167 #01 Y:2016 Recover waste heat from equipment $4,099 $4,200
UK1510 #12 Y:2015 Keep doors and windows shut when not on use $310 $90
UK1510 #11 Y:2015 Insulate glazing, walls, ceilings, and roofs $427 $273
UK1510 #10 Y:2015 Repair faulty insulation in furnaces, boilers, etc $305 $886
UK1510 #09 Y:2015 Install compressor air intakes in coolest locations $445 $650
UK1510 #08 Y:2015 Use only certified motor repair shops $623 $2,031
UK1510 #07 Y:2015 Reduce illumination to minimum necessary levels $849 -
UK1510 #06 Y:2015 Turn off equipment when not in use $1,236 -
UK1510 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,527 $2,143
UK1510 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $2,187 $2,890
UK1510 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $2,580 $2,360