Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile bag and canvas mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0541 #06 Y:2023 Replace existing hvac unit with high efficiency model $1,586 $8,304
LE0541 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,345 $4,836
LE0541 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $890 $2,400
LE0541 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,846 $4,210
LE0541 #02 Y:2023 Reduce the pressure of compressed air to the minimum required $1,461 $100
LE0541 #01 Y:2023 Turn off equipment during breaks, reduce operating time $856 -
LS2105 #06 Y:2021 Use solar heat to make electricty $40,438 $646,020
LS2105 #05 Y:2021 Utilize energy-efficient belts and other improved mechanisms $133 $580
LS2105 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $9,725 $9,408
LS2105 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $5,367 $675
LS2105 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $455 $50
LS2105 #01 Y:2021 Install timers and/or thermostats $1,466 $100
CO0651 #05 Y:2011 Reduce illumination to minimum necessary levels $1,030 $90
CO0651 #04 Y:2011 Improve air circulation with destratification fans / other methods $2,470 $20,920
CO0651 #03 Y:2011 Utilize higher efficiency lamps and/or ballasts $9,530 $31,210
CO0651 #02 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $1,300 $110
CO0651 #01 Y:2011 Condense operation into one building $17,750 $20,000
MA0580 #09 Y:2005 Turn off equipment during breaks, reduce operating time $312 -
MA0580 #08 Y:2005 Re-size charging openings or add movable cover or door $444 -
MA0580 #07 Y:2005 Turn off equipment during breaks, reduce operating time $611 -