36
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Textile bag and canvas mills | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LE0541 #06 Y:2023 | 06 | 2023 | Replace existing hvac unit with high efficiency model | $1,586 | $8,304 | |
LE0541 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $1,345 | $4,836 | |
LE0541 #04 Y:2023 | 04 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $890 | $2,400 | |
LE0541 #03 Y:2023 | 03 | 2023 | Utilize higher efficiency lamps and/or ballasts | $1,846 | $4,210 | |
LE0541 #02 Y:2023 | 02 | 2023 | Reduce the pressure of compressed air to the minimum required | $1,461 | $100 | |
LE0541 #01 Y:2023 | 01 | 2023 | Turn off equipment during breaks, reduce operating time | $856 | - | |
LS2105 #06 Y:2021 | 06 | 2021 | Use solar heat to make electricty | $40,438 | $646,020 | |
LS2105 #05 Y:2021 | 05 | 2021 | Utilize energy-efficient belts and other improved mechanisms | $133 | $580 | |
LS2105 #04 Y:2021 | 04 | 2021 | Utilize higher efficiency lamps and/or ballasts | $9,725 | $9,408 | |
LS2105 #03 Y:2021 | 03 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,367 | $675 | |
LS2105 #02 Y:2021 | 02 | 2021 | Reduce the pressure of compressed air to the minimum required | $455 | $50 | |
LS2105 #01 Y:2021 | 01 | 2021 | Install timers and/or thermostats | $1,466 | $100 | |
CO0651 #05 Y:2011 | 05 | 2011 | Reduce illumination to minimum necessary levels | $1,030 | $90 | |
CO0651 #04 Y:2011 | 04 | 2011 | Improve air circulation with destratification fans / other methods | $2,470 | $20,920 | |
CO0651 #03 Y:2011 | 03 | 2011 | Utilize higher efficiency lamps and/or ballasts | $9,530 | $31,210 | |
CO0651 #02 Y:2011 | 02 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,300 | $110 | |
CO0651 #01 Y:2011 | 01 | 2011 | Condense operation into one building | $17,750 | $20,000 | |
MA0580 #09 Y:2005 | 09 | 2005 | Turn off equipment during breaks, reduce operating time | $312 | - | |
MA0580 #08 Y:2005 | 08 | 2005 | Re-size charging openings or add movable cover or door | $444 | - | |
MA0580 #07 Y:2005 | 07 | 2005 | Turn off equipment during breaks, reduce operating time | $611 | - |