Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile product mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0535 #13 Y:2014 Install timers and/or thermostats $8,643 $1,000
NC0535 #12 Y:2014 Install vinyl strip / high speed / air curtain doors $161 $100
NC0535 #11 Y:2014 Recover waste heat from equipment $2,512 $8,000
NC0535 #10 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $598 $100
NC0535 #09 Y:2014 Recover waste heat from equipment $1,975 $1,750
NC0535 #08 Y:2014 Recover waste heat from equipment $1,917 $100
NC0535 #07 Y:2014 Develop a repair/replace policy $1,766 $8,146
NC0535 #06 Y:2014 Recharge batteries on during off-peak demand periods $917 $200
NC0535 #05 Y:2014 Reduce illumination to minimum necessary levels $214 $188
NC0535 #04 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,151 $320
NC0535 #03 Y:2014 Install occupancy sensors $667 $2,297
NC0535 #02 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,084 $1,846
NC0535 #01 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,964 $9,077
NC0492 #07 Y:2013 Reduce the pressure of compressed air to the minimum required $60 $90
NC0492 #06 Y:2013 Reduce space conditioning during non-working hours $20,838 $12,000
NC0492 #05 Y:2013 Reschedule plant operations or reduce load to avoid peaks $688 -
NC0492 #04 Y:2013 Reschedule plant operations or reduce load to avoid peaks $1,869 $100
NC0492 #03 Y:2013 Use photocell controls $259 $250
NC0492 #02 Y:2013 Reduce illumination to minimum necessary levels $6,492 $1,140
NC0492 #01 Y:2013 Install occupancy sensors $8,471 $13,495