Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile and fabric finishing and fabric coating mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0499 #14 Y:2013 Develop a repair/replace policy $2,055 $4,256
NC0499 #13 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $2,510 $100
NC0499 #12 Y:2013 Utilize higher efficiency lamps and/or ballasts $2,194 $451
NC0499 #11 Y:2013 Install occupancy sensors $3,113 $3,202
NC0499 #10 Y:2013 Utilize higher efficiency lamps and/or ballasts $3,040 $12,800
NC0499 #09 Y:2013 Utilize higher efficiency lamps and/or ballasts $8,448 $18,119
NC0499 #08 Y:2013 Recharge batteries on during off-peak demand periods $5,104 $200
NC0499 #07 Y:2013 Repair and eliminate steam leaks $1,306 $1,750
NC0499 #06 Y:2013 Install / repair insulation on steam lines $1,539 $1,165
NC0499 #05 Y:2013 Insulate bare equipment $3,164 $1,617
NC0499 #04 Y:2013 Use heat from boiler blowdown to preheat boiler feed water $10,670 $35,000
NC0499 #03 Y:2013 Use waste heat from hot flue gases to preheat $11,043 -
NC0499 #02 Y:2013 Operate boilers on high fire setting $17,607 $1,000
NC0499 #01 Y:2013 Use hot process fluids to preheat incoming process fluids $52,036 $15,000
NC0407 #06 Y:2010 Utilize higher efficiency lamps and/or ballasts $2,776 $6,897
NC0407 #05 Y:2010 Reduce the pressure of compressed air to the minimum required $350 $50
NC0407 #04 Y:2010 Install outside air damper / economizer on hvac unit $10,147 $42,000
NC0407 #03 Y:2010 Analyze flue gas for proper air/fuel ratio $3,606 $1,000
NC0407 #02 Y:2010 Use waste heat steam for absorption refrigeration $35,567 $200,000
NC0407 #01 Y:2010 Use cooling tower or economizer to replace chiller cooling $13,128 $60,000