85
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0499 #14 Y:2013 | 14 | 2013 | Develop a repair/replace policy | $2,055 | $4,256 | |
| NC0499 #13 Y:2013 | 13 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,510 | $100 | |
| NC0499 #12 Y:2013 | 12 | 2013 | Utilize higher efficiency lamps and/or ballasts | $2,194 | $451 | |
| NC0499 #11 Y:2013 | 11 | 2013 | Install occupancy sensors | $3,113 | $3,202 | |
| NC0499 #10 Y:2013 | 10 | 2013 | Utilize higher efficiency lamps and/or ballasts | $3,040 | $12,800 | |
| NC0499 #09 Y:2013 | 09 | 2013 | Utilize higher efficiency lamps and/or ballasts | $8,448 | $18,119 | |
| NC0499 #08 Y:2013 | 08 | 2013 | Recharge batteries on during off-peak demand periods | $5,104 | $200 | |
| NC0499 #07 Y:2013 | 07 | 2013 | Repair and eliminate steam leaks | $1,306 | $1,750 | |
| NC0499 #06 Y:2013 | 06 | 2013 | Install / repair insulation on steam lines | $1,539 | $1,165 | |
| NC0499 #05 Y:2013 | 05 | 2013 | Insulate bare equipment | $3,164 | $1,617 | |
| NC0499 #04 Y:2013 | 04 | 2013 | Use heat from boiler blowdown to preheat boiler feed water | $10,670 | $35,000 | |
| NC0499 #03 Y:2013 | 03 | 2013 | Use waste heat from hot flue gases to preheat | $11,043 | - | |
| NC0499 #02 Y:2013 | 02 | 2013 | Operate boilers on high fire setting | $17,607 | $1,000 | |
| NC0499 #01 Y:2013 | 01 | 2013 | Use hot process fluids to preheat incoming process fluids | $52,036 | $15,000 | |
| NC0407 #06 Y:2010 | 06 | 2010 | Utilize higher efficiency lamps and/or ballasts | $2,776 | $6,897 | |
| NC0407 #05 Y:2010 | 05 | 2010 | Reduce the pressure of compressed air to the minimum required | $350 | $50 | |
| NC0407 #04 Y:2010 | 04 | 2010 | Install outside air damper / economizer on hvac unit | $10,147 | $42,000 | |
| NC0407 #03 Y:2010 | 03 | 2010 | Analyze flue gas for proper air/fuel ratio | $3,606 | $1,000 | |
| NC0407 #02 Y:2010 | 02 | 2010 | Use waste heat steam for absorption refrigeration | $35,567 | $200,000 | |
| NC0407 #01 Y:2010 | 01 | 2010 | Use cooling tower or economizer to replace chiller cooling | $13,128 | $60,000 |