Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

526

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Breweries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0633 #11 Y:2025 Use solar heat to make electricty $223,918 $872,791
SF0633 #10 Y:2025 Replace existing chiller with high efficiency model $8,335 $80,990
SF0633 #09 Y:2025 Minimize water usage $3,105 $23,556
SF0633 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $32,940 $114,566
SF0633 #07 Y:2025 Eliminate or reduce compressed air usage $10,943 $20,376
SF0633 #06 Y:2025 Insulate bare equipment $3,235 $4,152
SF0633 #05 Y:2025 Utilize controls to operate equipment only when needed $32,787 $17,210
SF0633 #04 Y:2025 Utilize controls to operate equipment only when needed $12,083 $2,208
SF0633 #03 Y:2025 Repair and eliminate steam leaks $2,640 -
SF0633 #02 Y:2025 Turn off equipment when not in use $3,867 -
SF0633 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $28,680 -
AS0601 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $105 $180
AS0601 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $416 $942
AS0601 #05 Y:2025 Insulate bare equipment $852 $3,546
AS0601 #04 Y:2025 Use computer programs to optimize hvac performance $4,347 $618
AS0601 #03 Y:2025 Use solar heat to make electricty $21,962 $176,288
AS0601 #02 Y:2025 Recover and reuse waste material $76,561 $120,000
AS0601 #01 Y:2025 Add equipment/ operators to reduce production bottleneck $130,000 $66,000
AS0595 #07 Y:2024 Install timers on light switches in little used areas $132 $254
AS0595 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $255 $197