2,057
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
AS0595 #07 Y:2024 | 07 | 2024 | Install timers on light switches in little used areas | $132 | $254 |
n/a
|
AS0595 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $255 | $197 |
n/a
|
AS0595 #05 Y:2024 | 05 | 2024 | Reduce the pressure of compressed air to the minimum required | $336 | $44 |
n/a
|
AS0595 #04 Y:2024 | 04 | 2024 | Install heat pipes / raise cooling setpoint | $420 | $72 |
n/a
|
AS0595 #03 Y:2024 | 03 | 2024 | Use computer programs to optimize hvac performance | $1,366 | $166 |
n/a
|
AS0595 #02 Y:2024 | 02 | 2024 | Add equipment/ operators to reduce production bottleneck | $3,901 | $142 |
n/a
|
AS0595 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $17,614 | $149,397 |
n/a
|
CI0038 #10 Y:2024 | 10 | 2024 | Recharge batteries on during off-peak demand periods | $577 | $150 |
n/a
|
CI0038 #09 Y:2024 | 09 | 2024 | Replace fossil fuel equipment with electrical equipment | $765 | $3,000 |
n/a
|
CI0038 #08 Y:2024 | 08 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,786 | $792 |
n/a
|
CI0038 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $2,690 | $1,100 |
n/a
|
CI0038 #06 Y:2024 | 06 | 2024 | Replace boiler | $3,607 | $9,000 |
n/a
|
CI0038 #05 Y:2024 | 05 | 2024 | Use photocell controls | $4,714 | $1,500 |
n/a
|
CI0038 #04 Y:2024 | 04 | 2024 | Use optimum thickness insulation | $8,867 | $17,866 |
n/a
|
CI0038 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,400 | $1,000 |
n/a
|
CI0038 #02 Y:2024 | 02 | 2024 | Install vinyl strip / high speed / air curtain doors | $28,800 | $10,000 |
n/a
|
CI0038 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $57,768 | $242,254 |
n/a
|
UF0623 #08 Y:2024 | 08 | 2024 | Replace existing equipment with more suitable substitutes | $56,000 | $20,720 |
n/a
|
UF0623 #07 Y:2024 | 07 | 2024 | Improve combustion control capability | $958 | $1,400 |
n/a
|
UF0623 #06 Y:2024 | 06 | 2024 | Install turbulators | $979 | $3,750 |
n/a
|