Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,210

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Beverage and tobacco product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0601 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $105 $180
AS0601 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $416 $942
AS0601 #05 Y:2025 Insulate bare equipment $852 $3,546
AS0601 #04 Y:2025 Use computer programs to optimize hvac performance $4,347 $618
AS0601 #03 Y:2025 Use solar heat to make electricty $21,962 $176,288
AS0601 #02 Y:2025 Recover and reuse waste material $76,561 $120,000
AS0601 #01 Y:2025 Add equipment/ operators to reduce production bottleneck $130,000 $66,000
SF0631 #07 Y:2024 Recover waste heat from equipment $4,255 $13,190
SF0631 #06 Y:2024 Use / purchase optimum sized compressor $42,980 $125,625
SF0631 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $7,321 $6,254
SF0631 #04 Y:2024 Insulate bare equipment $523 $419
SF0631 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $768 $122
SF0631 #02 Y:2024 Reduce space conditioning during non-working hours $16,164 $441
SF0631 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,844 -
AS0595 #07 Y:2024 Install timers on light switches in little used areas $132 $254
AS0595 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $255 $197
AS0595 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $336 $44
AS0595 #04 Y:2024 Install heat pipes / raise cooling setpoint $420 $72
AS0595 #03 Y:2024 Use computer programs to optimize hvac performance $1,366 $166
AS0595 #02 Y:2024 Add equipment/ operators to reduce production bottleneck $3,901 $142