Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

578

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0696 #11 Y:2026 Recharge batteries on during off-peak demand periods $21,926 -
SD0696 #10 Y:2026 Use most efficient type of electric motors $13,481 $25,837
SD0696 #09 Y:2026 Use battery storage for demand control $1,477,872 $2,250,500
SD0696 #08 Y:2026 Use solar heat to make electricty $1,726,080 $4,030,264
SD0696 #07 Y:2026 Reduce the pressure of compressed air to the minimum required $6,239 -
SD0696 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $31,989 $17,285
SD0696 #05 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $8,185 $12,200
SD0696 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $930 $2,200
SD0696 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,185 $2,400
SD0696 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,185 $2,400
SD0696 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,359 $7,047
UC2606 #08 Y:2026 Utilize energy-efficient belts and other improved mechanisms $3,684 $500
UC2606 #07 Y:2026 Adjust burners for efficient operation $676 $800
UC2606 #06 Y:2026 Use waste heat from hot flue gases to preheat $2,247 $10,000
UC2606 #05 Y:2026 Install occupancy sensors $259 $1,320
UC2606 #04 Y:2026 Install / repair insulation on steam lines $1,776 $2,656
UC2606 #03 Y:2026 Insulate bare equipment $284 $902
UC2606 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $77 $98
UC2606 #01 Y:2026 Pay utility bills on time $7,137 -
UL2603 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,696 $20,685