ITAC Assessment: SD0696
ITAC logo
ITAC Assessment: SD0696
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Sliced Fruit and Vegetables
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 132
Plant Area 1,000,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 4,335
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,294,214 20,340,429
kWh
Electricity Demand $1,383,416 41,543
kW-mo/yr
Electricity Fees $9,332 -
TOTAL YEARLY COSTS $3,686,962
RECOMMENDED SAVINGS* $3,306,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,359 $7,047 $7,351
65,170
kWh
$6,007
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,185 $2,400 $2,240
19,861
kWh
$945
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,185 $2,400 $2,240
19,861
kWh
$945
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $930 $2,200 $654
5,799
kWh
$276
-
kW-mo/yr
05 2.4223: Install direct acting units in place of compressed air pressure system in safety system $8,185 $12,200 $8,185
72,566
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $31,989 $17,285 $17,604
156,060
kWh
$14,386
-
kW-mo/yr
07 2.4231: Reduce the pressure of compressed air to the minimum required $6,239 - $6,239
55,314
kWh
-
08 2.9114: Use solar heat to make electricty $1,726,080 $4,030,264 $767,040
6,800,000
kWh
$959,040
-
kW-mo/yr
09 2.3141: Use battery storage for demand control $1,477,872 $2,250,500 $(-40,608.0)
(-360,000)
kWh
$1,518,480
-
kW-mo/yr
10 2.4133: Use most efficient type of electric motors $13,481 $25,837 $6,452
57,195
kWh
$7,030
-
kW-mo/yr
11 2.3132: Recharge batteries on during off-peak demand periods $21,926 - - $21,926
-
kW-mo/yr
TOTAL RECOMMENDED $3,306,430 $6,350,133 $777,397
6,891,826
kWh
$2,529,033
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs