ITAC Assessment: UW2510
ITAC logo
ITAC Assessment: UW2510
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Multiwall Paper and Polywoven Bags
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 327,000
ft2
Annual Production 36,000,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,902 1,026,019
kWh
Electricity Demand $269 43
kW-mo/yr
Electricity Fees $6,323 -
TOTAL YEARLY COSTS $120,494
RECOMMENDED SAVINGS* $10,643,823 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
01 2.4221: Install compressor air intakes in coolest locations $1,701 $4,278 $1,685
15,184
kWh
$15
-
kW-mo/yr
-
02 4.111: Add equipment/ operators to reduce production bottleneck $10,639,200 $32,000,000 - - $10,639,200
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,923 $9,402 $2,897
26,333
kWh
$26
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,643,823 $32,013,680 $4,582
41,517
kWh
$41
-
kW-mo/yr
$10,639,200
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs