735
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OR0804 #06 Y:2024 | 06 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $634 | - |
n/a
|
OR0804 #05 Y:2024 | 05 | 2024 | Insulate bare equipment | $1,439 | $4,063 |
n/a
|
OR0804 #04 Y:2024 | 04 | 2024 | Use or replace with energy efficient substitutes | $8,678 | $51,877 |
n/a
|
OR0804 #03 Y:2024 | 03 | 2024 | Analyze flue gas for proper air/fuel ratio | $5,461 | - |
n/a
|
OR0804 #02 Y:2024 | 02 | 2024 | Increase efficiency of trucks | $473,339 | $1,593,482 |
n/a
|
OR0804 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $27,473 | $22,751 |
n/a
|
MZ0359 #06 Y:2024 | 06 | 2024 | Use excess cold process fluid for industrial cooling needs | $4,846 | $17,804 |
n/a
|
MZ0359 #05 Y:2024 | 05 | 2024 | Install vinyl strip / high speed / air curtain doors | $2,952 | $1,511 |
n/a
|
MZ0359 #04 Y:2024 | 04 | 2024 | Install compressor air intakes in coolest locations | $7,203 | $14,000 |
n/a
|
MZ0359 #03 Y:2024 | 03 | 2024 | Install occupancy sensors | $609 | $1,400 |
n/a
|
MZ0359 #02 Y:2024 | 02 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $679 | $620 |
n/a
|
MZ0359 #01 Y:2024 | 01 | 2024 | Lower temperature during the winter season and vice-versa | $1,403 | $3,100 |
n/a
|
LE0579 #05 Y:2024 | 05 | 2024 | Replace boiler | $96,643 | $400,000 |
n/a
|
LE0579 #04 Y:2024 | 04 | 2024 | Utilize higher efficiency lamps and/or ballasts | $12,804 | $49,222 |
n/a
|
LE0579 #03 Y:2024 | 03 | 2024 | Install compressor air intakes in coolest locations | $2,383 | $5,000 |
n/a
|
LE0579 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,704 | $2,300 |
n/a
|
LE0579 #01 Y:2024 | 01 | 2024 | Install occupancy sensors | $1,555 | $510 |
n/a
|
UL2406 #09 Y:2024 | 09 | 2024 | Use outside cold water source as a supply of cooling water | $35,350 | $159,350 |
n/a
|
UL2406 #08 Y:2024 | 08 | 2024 | Use solar heat to make electricty | $78,236 | $775,946 |
n/a
|
UL2406 #07 Y:2024 | 07 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $3,544 | $12,225 |
n/a
|