Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

779

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0390 #08 Y:2025 Use or replace with energy efficient substitutes $2,878 $1,700
MZ0390 #07 Y:2025 Install occupancy sensors $196 $725
MZ0390 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $3,595 $1,000
MZ0390 #05 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $11,755 $46,600
MZ0390 #04 Y:2025 Analyze flue gas for proper air/fuel ratio $7,996 $1,600
MZ0390 #03 Y:2025 Chill water to the highest temperature possible $9,218 $13,460
MZ0390 #02 Y:2025 Chill water to the highest temperature possible $8,616 $19,492
MZ0390 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $23,516 $17,100
LE0605 #05 Y:2025 Replace existing hvac unit with high efficiency model $6,798 $33,750
LE0605 #04 Y:2025 Replace existing hvac unit with high efficiency model $11,122 $43,200
LE0605 #03 Y:2025 Clean or color roof to reduce solar load $2,453 $7,474
LE0605 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,562 $2,185
LE0605 #01 Y:2025 Install timers and/or thermostats $1,124 $1,120
SF0642 #10 Y:2025 Use solar heat to make electricty $149,526 $1,422,752
SF0642 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $87,783 $439,056
SF0642 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,510 $26,163
SF0642 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $131,400 $376,158
SF0642 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $20,385 $14,781
SF0642 #05 Y:2025 Modify refrigeration system to operate at a lower pressure $285,746 $93,750
SF0642 #04 Y:2025 Utilize controls to operate equipment only when needed $38,247 $10,626