Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Seasoning and dressing manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0385 #08 Y:2014 Analyze flue gas for proper air/fuel ratio $2,231 $4,000
LE0385 #07 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,022 $1,700
LE0385 #06 Y:2014 Preheat boiler makeup water with waste process heat $8,266 $13,200
LE0385 #05 Y:2014 Install occupancy sensors $7,685 $12,000
LE0385 #04 Y:2014 Use / purchase optimum sized compressor $8,746 $11,000
LE0385 #03 Y:2014 Reschedule plant operations or reduce load to avoid peaks $10,210 $3,040
LE0385 #02 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $38,455 $1,000
LE0385 #01 Y:2014 Reduce the pressure of compressed air to the minimum required $10,165 $40
TT0125 #07 Y:2013 Utilize higher efficiency lamps and/or ballasts $1,282 $550
TT0125 #06 Y:2013 Install occupancy sensors $724 $720
TT0125 #05 Y:2013 Install occupancy sensors $388 $360
TT0125 #04 Y:2013 Install occupancy sensors $148 $240
TT0125 #03 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $724 $1,000
TT0125 #02 Y:2013 Install / repair insulation on steam lines $764 $505
TT0125 #01 Y:2013 Repair and eliminate steam leaks $11,367 $1,500
MA0712 #08 Y:2013 Insulate bare equipment $323 $750
MA0712 #07 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $827 $1,200
MA0712 #06 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $853 $2,930
MA0712 #05 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $938 $2,930
MA0712 #04 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $1,440 $4,200