Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Seasoning and dressing manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0481 #08 Y:2004 Use waste heat from hot flue gases to preheat $4,275 $5,500
WI0481 #07 Y:2004 Install compressor air intakes in coolest locations $1,863 $1,280
WI0481 #06 Y:2004 Recover waste heat from equipment $4,392 $1,600
WI0481 #05 Y:2004 Repair or replace steam traps $6,480 $1,410
WI0481 #04 Y:2004 Utilize higher efficiency lamps and/or ballasts $14,772 $32,176
WI0481 #03 Y:2004 Recover heat from exhausted steam, hot air or hot water $30,366 $8,400
WI0481 #02 Y:2004 Utilize other methods to remove contaminants $187,529 $126,000
WI0481 #01 Y:2004 Install equipment to move product $220,500 $28,500
OR0467 #04 Y:2004 Use hot process fluids to preheat incoming process fluids $46,000 $25,000
OR0467 #03 Y:2004 Modify refrigeration system to operate at a lower pressure $2,000 $31,500
OR0467 #02 Y:2004 Use filtration, centrifuging to remove contaminants $27,150 $252,000
OR0467 #01 Y:2004 Replace existing equipment with more suitable substitutes $148,000 $50
SF0292 #08 Y:2004 Reuse / recycle/ sell paper products $7,275 $12,330
SF0292 #07 Y:2004 Utilize higher efficiency lamps and/or ballasts $9,181 $48,511
SF0292 #06 Y:2004 Insulate bare equipment $423 $1,125
SF0292 #05 Y:2004 Reduce the pressure of compressed air to the minimum required $1,755 $2,283
SF0292 #04 Y:2004 Use most efficient type of electric motors $768 $763
SF0292 #03 Y:2004 Utilize higher efficiency lamps and/or ballasts $2,366 $860
SF0292 #02 Y:2004 Install occupancy sensors $7,440 $2,833
SF0292 #01 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,014 -