82
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Dry pasta, dough, and flour mixes manufacturing from purchased flour | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SJ0026 #10 Y:2024 | 10 | 2024 | Recover heat from exhausted steam, hot air or hot water | $706 | $1,151 |
n/a
|
SJ0026 #09 Y:2024 | 09 | 2024 | Reduce excessive boiler blowdown | $2,261 | $1,017 |
n/a
|
SJ0026 #08 Y:2024 | 08 | 2024 | Adjust / maintain fork lift trucks for most efficient operation | $4,132 | $25,650 |
n/a
|
SJ0026 #07 Y:2024 | 07 | 2024 | Reduce the pressure of compressed air to the minimum required | $400 | - |
n/a
|
SJ0026 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $2,177 | $9,200 |
n/a
|
SJ0026 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $8,978 | $9,706 |
n/a
|
SJ0026 #04 Y:2024 | 04 | 2024 | Install vinyl strip / high speed / air curtain doors | $123,957 | $18,405 |
n/a
|
SJ0026 #03 Y:2024 | 03 | 2024 | Preheat boiler makeup water with waste process heat | $1,192 | $888 |
n/a
|
SJ0026 #02 Y:2024 | 02 | 2024 | Insulate bare equipment | $653 | $607 |
n/a
|
SJ0026 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $79,569 | $266,719 |
n/a
|
MU0035 #06 Y:2023 | 06 | 2023 | Eliminate/reduce an operation | $13,378 | - | |
MU0035 #05 Y:2023 | 05 | 2023 | Reduce illumination to minimum necessary levels | $934 | - | |
MU0035 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $9,453 | $5,164 | |
MU0035 #03 Y:2023 | 03 | 2023 | Turn off equipment when not in use | $1,539 | - | |
MU0035 #02 Y:2023 | 02 | 2023 | Keep equipment clean | $216 | - | |
MU0035 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,081 | $374 | |
UW2303 #06 Y:2023 | 06 | 2023 | Install vinyl strip / high speed / air curtain doors | $2,084 | $5,025 | |
UW2303 #05 Y:2023 | 05 | 2023 | Reduce illumination to minimum necessary levels | $199 | $282 | |
UW2303 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $702 | $959 | |
UW2303 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,161 | $624 |