ITAC Assessment: UW2303
ITAC logo
ITAC Assessment: UW2303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
NAICS 311824: Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $500
k
to 1
M
# of Employees 62
Plant Area 126,462
ft2
Annual Production 60,000
lb
Production Hrs. Annual 4,284
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,938 920,229
kWh
Electricity Demand $23,567 5,443
kW-mo/yr
Electricity Fees $997 -
Natural Gas $5,090 432
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $53,600 1,324,084
lb
TOTAL YEARLY COSTS $158,192
RECOMMENDED SAVINGS* $8,423 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $687 $1,488 $601
7,382
kWh
$86
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $590 $124 $590
7,242
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,161 $624 $3,641
44,725
kWh
$520
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $702 $959 $611
7,507
kWh
$91
-
kW-mo/yr
-
05 2.7111: Reduce illumination to minimum necessary levels $199 $282 $176
1,877
kWh
$23
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,084 $5,025 - - $2,084
-
MMBtu
TOTAL RECOMMENDED $8,423 $8,502 $5,619
68,733
kWh
$720
-
kW-mo/yr
$2,084
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs