ITAC Assessment: MU0035
ITAC logo
ITAC Assessment: MU0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Assorted baked good mix
NAICS 311824: Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $100
M
to 500
M
# of Employees 180
Plant Area 172,000
ft2
Annual Production 260,000,000
lb
Production Hrs. Annual 7,176
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $449,621 4,985,921
kWh
Electricity Fees $29,949 -
Natural Gas $30,002 10,510
MMBtu
TOTAL YEARLY COSTS $509,572
RECOMMENDED SAVINGS* $32,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,081 $374 $7,081
70,798
kWh
02 2.6125: Keep equipment clean $216 - $216
2,160
kWh
03 2.6218: Turn off equipment when not in use $1,539 - $1,539
15,391
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,453 $5,164 $9,453
94,527
kWh
05 2.7111: Reduce illumination to minimum necessary levels $934 - $934
9,337
kWh
06 3.1161: Eliminate/reduce an operation $13,378 - $13,378
133,779
kWh
TOTAL RECOMMENDED $32,601 $5,538 $32,601
325,992
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs