271
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SJ0026 #10 Y:2024 | 10 | 2024 | Recover heat from exhausted steam, hot air or hot water | $706 | $1,151 |
n/a
|
SJ0026 #09 Y:2024 | 09 | 2024 | Reduce excessive boiler blowdown | $2,261 | $1,017 |
n/a
|
SJ0026 #08 Y:2024 | 08 | 2024 | Adjust / maintain fork lift trucks for most efficient operation | $4,132 | $25,650 |
n/a
|
SJ0026 #07 Y:2024 | 07 | 2024 | Reduce the pressure of compressed air to the minimum required | $400 | - |
n/a
|
SJ0026 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $2,177 | $9,200 |
n/a
|
SJ0026 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $8,978 | $9,706 |
n/a
|
SJ0026 #04 Y:2024 | 04 | 2024 | Install vinyl strip / high speed / air curtain doors | $123,957 | $18,405 |
n/a
|
SJ0026 #03 Y:2024 | 03 | 2024 | Preheat boiler makeup water with waste process heat | $1,192 | $888 |
n/a
|
SJ0026 #02 Y:2024 | 02 | 2024 | Insulate bare equipment | $653 | $607 |
n/a
|
SJ0026 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $79,569 | $266,719 |
n/a
|
IC0302 #10 Y:2024 | 10 | 2024 | Use most efficient type of electric motors | $13,478 | $12,801 |
n/a
|
IC0302 #09 Y:2024 | 09 | 2024 | Use waste heat from hot flue gases to preheat incoming fluids | $2,215 | $4,414 |
n/a
|
IC0302 #08 Y:2024 | 08 | 2024 | Insulate bare equipment | $1,385 | $1,118 |
n/a
|
IC0302 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $320 | - |
n/a
|
IC0302 #06 Y:2024 | 06 | 2024 | Eliminate or reduce compressed air usage | $2,025 | $350 |
n/a
|
IC0302 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $1,613 | - |
n/a
|
IC0302 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $376 | - |
n/a
|
IC0302 #03 Y:2024 | 03 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $411 | - |
n/a
|
IC0302 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $215 | $1,256 |
n/a
|
IC0302 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,001 | $2,566 |
n/a
|