Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Retail bakeries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0841 #06 Y:2022 Install occupancy sensors $253 $234
MA0841 #05 Y:2022 Use heat pump for space conditioning $2,033 $7,500
MA0841 #04 Y:2022 Apply for tax-free status for energy purchases $5,842 $500
MA0841 #03 Y:2022 Ventilation system to shut off when room is not in use $9,761 $49,341
MA0841 #02 Y:2022 Use solar heat to make electricty $24,631 $155,407
MA0841 #01 Y:2022 Meter recycled water (to reduce sewer charges) $11,138 $8,830
MA0835 #05 Y:2022 Reduce the pressure of compressed air to the minimum required $4,360 $625
MA0835 #04 Y:2022 Analyze flue gas for proper air/fuel ratio $680 $750
MA0835 #03 Y:2022 Recover waste heat from equipment $18,072 $14,280
MA0835 #02 Y:2022 Use heat pump for space conditioning $2,773 $7,150
MA0835 #01 Y:2022 Use waste heat from hot flue gases to preheat $10,572 $40,722
MA0836 #08 Y:2022 Reduce the pressure of compressed air to the minimum required $1,781 $625
MA0836 #07 Y:2022 Use heat pump for space conditioning $2,777 $7,150
MA0836 #06 Y:2022 Limit and control secondary combustion air in furnace $7,372 $500
MA0836 #05 Y:2022 Analyze flue gas for proper air/fuel ratio $5,531 $1,500
MA0836 #04 Y:2022 Turn off equipment during breaks, reduce operating time $6,264 $875
MA0836 #03 Y:2022 Replace existing chiller with high efficiency model $9,895 $23,950
MA0836 #02 Y:2022 Recover waste heat from equipment $9,598 $34,642
MA0836 #01 Y:2022 Use waste heat from hot flue gases to preheat $16,115 $39,510
UA0189 #06 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $3,357 $3,000