Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Retail bakeries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0581 #10 Y:2025 Install occupancy sensors $123 $769
SU0581 #09 Y:2025 Recover waste heat from equipment $4,318 $15,784
SU0581 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $149 $172
SU0581 #07 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,877 $1,220
SU0581 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,579 $1,648
SU0581 #05 Y:2025 Use or replace with energy efficient substitutes $697 $38
SU0581 #04 Y:2025 Reduce space conditioning during non-working hours $1,336 -
SU0581 #03 Y:2025 Eliminate or reduce compressed air usage $1,466 -
SU0581 #02 Y:2025 Disconnect ballasts $331 -
SU0581 #01 Y:2025 Recharge batteries on during off-peak demand periods $990 -
MA0841 #06 Y:2022 Install occupancy sensors $253 $234
MA0841 #05 Y:2022 Use heat pump for space conditioning $2,033 $7,500
MA0841 #04 Y:2022 Apply for tax-free status for energy purchases $5,842 $500
MA0841 #03 Y:2022 Ventilation system to shut off when room is not in use $9,761 $49,341
MA0841 #02 Y:2022 Use solar heat to make electricty $24,631 $155,407
MA0841 #01 Y:2022 Meter recycled water (to reduce sewer charges) $11,138 $8,830
MA0835 #05 Y:2022 Reduce the pressure of compressed air to the minimum required $4,360 $625
MA0835 #04 Y:2022 Analyze flue gas for proper air/fuel ratio $680 $750
MA0835 #03 Y:2022 Recover waste heat from equipment $18,072 $14,280
MA0835 #02 Y:2022 Use heat pump for space conditioning $2,773 $7,150