Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,558

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Bakeries and tortilla manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2417 #06 Y:2024 Lower temperature during the winter season and vice-versa $1,329 -
UC2417 #05 Y:2024 Insulate bare equipment $5,554 $1,800
UC2417 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $1,301 $75
UC2417 #03 Y:2024 Replace existing hvac unit with high efficiency model $1,989 $7,146
UC2417 #02 Y:2024 Optimize plant power factor $2,644 $9,173
UC2417 #01 Y:2024 Pay utility bills on time $888 -
SJ0026 #10 Y:2024 Recover heat from exhausted steam, hot air or hot water $706 $1,151
SJ0026 #09 Y:2024 Reduce excessive boiler blowdown $2,261 $1,017
SJ0026 #08 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $4,132 $25,650
SJ0026 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $400 -
SJ0026 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,177 $9,200
SJ0026 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $8,978 $9,706
SJ0026 #04 Y:2024 Install vinyl strip / high speed / air curtain doors $123,957 $18,405
SJ0026 #03 Y:2024 Preheat boiler makeup water with waste process heat $1,192 $888
SJ0026 #02 Y:2024 Insulate bare equipment $653 $607
SJ0026 #01 Y:2024 Use solar heat to make electricty $79,569 $266,719
TT0310 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $335 $75
TT0310 #06 Y:2024 Reduce the pressure of compressed air to the minimum required $4,799 $60
TT0310 #05 Y:2024 Install occupancy sensors $6,590 $2,200
TT0310 #04 Y:2024 Optimize plant power factor $7,227 $9,500