21
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Poultry processing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0827 #10 Y:2006 | 10 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,887 | $3,400 | |
| GT0827 #09 Y:2006 | 09 | 2006 | Recover waste heat from equipment | $158,948 | $150,000 | |
| GT0827 #08 Y:2006 | 08 | 2006 | Meter waste water | $81,583 | $5,250 | |
| GT0827 #07 Y:2006 | 07 | 2006 | Minimize operation of equipment maintained in standby condition | $2,734 | $3,500 | |
| GT0827 #06 Y:2006 | 06 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,361 | $2,328 | |
| GT0827 #05 Y:2006 | 05 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,421 | $4,053 | |
| GT0827 #04 Y:2006 | 04 | 2006 | Reduce excess steam bleeding | $10,400 | $39,900 | |
| GT0827 #03 Y:2006 | 03 | 2006 | Use steam condensate for hot water supply (non-potable) | $85,490 | $12,500 | |
| GT0827 #02 Y:2006 | 02 | 2006 | Use waste heat from hot flue gases to preheat | $325,944 | $38,000 | |
| GT0827 #01 Y:2006 | 01 | 2006 | Utilize energy-efficient belts and other improved mechanisms | $5,551 | $1,487 | |
| GT0791 #11 Y:2004 | 11 | 2004 | Utilize higher efficiency lamps and/or ballasts | $4,540 | $14,700 | n/a |
| GT0791 #10 Y:2004 | 10 | 2004 | Utilize higher efficiency lamps and/or ballasts | $2,680 | $6,882 | n/a |
| GT0791 #09 Y:2004 | 09 | 2004 | Use most efficient type of electric motors | $8,041 | $18,139 | n/a |
| GT0791 #08 Y:2004 | 08 | 2004 | Utilize energy-efficient belts and other improved mechanisms | $607 | $1,112 | n/a |
| GT0791 #07 Y:2004 | 07 | 2004 | Use flue gases to heat process or service water | $10,622 | $17,600 | n/a |
| GT0791 #06 Y:2004 | 06 | 2004 | Install compressor air intakes in coolest locations | $605 | $800 | n/a |
| GT0791 #05 Y:2004 | 05 | 2004 | Use flue gases to heat process or service water | $74,318 | $31,600 | n/a |
| GT0791 #04 Y:2004 | 04 | 2004 | Insulate bare equipment | $5,322 | $2,727 | n/a |
| GT0791 #03 Y:2004 | 03 | 2004 | Repair and eliminate steam leaks | $4,304 | $400 | n/a |
| GT0791 #02 Y:2004 | 02 | 2004 | Insulate bare equipment | $1,576 | $628 | n/a |