| Assessment Year | 2004 |
|---|---|
| Principal Product | FROZEN CHICKEN |
| NAICS | 311615: Poultry Processing |
| SIC | 2015: Poultry Slaughtering and Processing |
| Sales Range | $50 M to 100M |
| # of Employees | 560 |
| Plant Area |
123,610
ft2
|
| Annual Production | 27,000
ton
|
| Production Hrs. Annual | 4,675
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $912,201 | 18,712,340 |
kWh
|
$0.049 |
| Natural Gas | $971,919 | 148,408 |
MMBtu
|
$6.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $161,420 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $48,805 | $1,000 | n/a | - | - | $48,805 |
| 02 | 2.2511: Insulate bare equipment | $1,576 | $628 | n/a | - |
$1,576
-
MMBtu
|
- |
| 03 | 2.2135: Repair and eliminate steam leaks | $4,304 | $400 | n/a | - |
$4,304
-
MMBtu
|
- |
| 04 | 2.2511: Insulate bare equipment | $5,322 | $2,727 | n/a | - |
$5,322
-
MMBtu
|
- |
| 05 | 2.2425: Use flue gases to heat process or service water | $74,318 | $31,600 | n/a | - |
$74,318
-
MMBtu
|
- |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $605 | $800 | n/a |
$605
13,043
kWh
|
- | - |
| 07 | 2.2425: Use flue gases to heat process or service water | $10,622 | $17,600 | n/a | - |
$10,622
-
MMBtu
|
- |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $607 | $1,112 | n/a |
$607
13,082
kWh
|
- | - |
| 09 | 2.4133: Use most efficient type of electric motors | $8,041 | $18,139 | n/a |
$8,041
152,000
kWh
|
- | - |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,680 | $6,882 | n/a |
$2,680
56,470
kWh
|
- | - |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,540 | $14,700 | n/a |
$4,540
95,510
kWh
|
- | - |
| TOTAL RECOMMENDED | $161,420 | $95,588 |
$16,473
330,105
kWh
|
$96,142
-
MMBtu
|
$48,805 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs