ITAC Assessment: GT0791
ITAC logo
ITAC Assessment: GT0791
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product FROZEN CHICKEN
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $50
M
to 100
M
# of Employees 560
Plant Area 123,610
ft2
Annual Production 27,000
ton
Production Hrs. Annual 4,675
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $912,201 18,712,340
kWh
Natural Gas $971,919 148,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $161,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $48,805 $1,000 n/a - - $48,805
02 2.2511: Insulate bare equipment $1,576 $628 n/a - $1,576
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $4,304 $400 n/a - $4,304
-
MMBtu
-
04 2.2511: Insulate bare equipment $5,322 $2,727 n/a - $5,322
-
MMBtu
-
05 2.2425: Use flue gases to heat process or service water $74,318 $31,600 n/a - $74,318
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $605 $800 n/a $605
13,043
kWh
- -
07 2.2425: Use flue gases to heat process or service water $10,622 $17,600 n/a - $10,622
-
MMBtu
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $607 $1,112 n/a $607
13,082
kWh
- -
09 2.4133: Use most efficient type of electric motors $8,041 $18,139 n/a $8,041
152,000
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,680 $6,882 n/a $2,680
56,470
kWh
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $4,540 $14,700 n/a $4,540
95,510
kWh
- -
TOTAL RECOMMENDED $161,420 $95,588 $16,473
330,105
kWh
$96,142
-
MMBtu
$48,805
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs