Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ice cream and frozen dessert manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1018 #09 Y:2020 Minimize contamination of water before treatment $1,096,761 $5,000,000
UD1018 #08 Y:2020 Insulate bare equipment $359 $392
UD1018 #07 Y:2020 Analyze flue gas for proper air/fuel ratio $1,072 -
UD1018 #06 Y:2020 Replace obsolete burners with more efficient ones $16,717 $64,900
UD1018 #05 Y:2020 Eliminate or reduce compressed air usage $1,584 $1,500
UD1018 #04 Y:2020 Redesign process $43,180 $20,000
UD1018 #03 Y:2020 Use excess cold process fluid for industrial cooling needs $25,124 -
UD1018 #02 Y:2020 Recover waste heat from equipment $62,174 $26,600
UD1018 #01 Y:2020 Utilize energy-efficient belts and other improved mechanisms $515 -
UD0938 #11 Y:2015 Minimize water usage $27,153 $9,300
UD0938 #10 Y:2015 Install compressor air intakes in coolest locations $1,880 $15,000
UD0938 #09 Y:2015 Replace existing hvac unit with high efficiency model $807 $3,133
UD0938 #08 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $4,596 $20,100
UD0938 #07 Y:2015 Develop a repair/replace policy $152 $530
UD0938 #06 Y:2015 Utilize energy-efficient belts and other improved mechanisms $1,415 -
UD0938 #05 Y:2015 Modify refrigeration system to operate at a lower pressure $29,938 $3,000
UD0938 #04 Y:2015 Upgrade controls on compressors $107,431 -
UD0938 #03 Y:2015 Recharge batteries on during off-peak demand periods $1,403 -
UD0938 #02 Y:2015 Analyze flue gas for proper air/fuel ratio $3,298 -
UD0938 #01 Y:2015 Turn off equipment when not in use $39,463 -