| SF0404 #12 Y:2011 | 12 | 2011 | Recover waste heat from equipment | $3,982 | $20,358 | |
| SF0404 #11 Y:2011 | 11 | 2011 | Utilize higher efficiency lamps and/or ballasts | $10,910 | $55,222 | |
| SF0404 #10 Y:2011 | 10 | 2011 | Install timers on light switches in little used areas | $676 | $1,569 | |
| SF0404 #09 Y:2011 | 09 | 2011 | Install compressor air intakes in coolest locations | $483 | $901 | |
| SF0404 #08 Y:2011 | 08 | 2011 | Install occupancy sensors | $697 | $1,356 | |
| SF0404 #07 Y:2011 | 07 | 2011 | Use adjustable frequency drive or multiple speed motors on existing system | $6,681 | $5,213 | |
| SF0404 #06 Y:2011 | 06 | 2011 | Modify refrigeration system to operate at a lower pressure | $16,688 | $12,500 | |
| SF0404 #05 Y:2011 | 05 | 2011 | Use adjustable frequency drive or multiple speed motors on existing system | $5,812 | $2,778 | |
| SF0404 #04 Y:2011 | 04 | 2011 | Install / repair insulation on steam lines | $17,934 | $5,426 | |
| SF0404 #03 Y:2011 | 03 | 2011 | Reduce illumination to minimum necessary levels | $257 | $22 | |
| SF0404 #02 Y:2011 | 02 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,243 | - | |
| SF0404 #01 Y:2011 | 01 | 2011 | Operate boilers on high fire setting | $2,708 | - | |
| LM0116 #06 Y:2006 | 06 | 2006 | Turn off equipment when not in use | $260 | - | |
| LM0116 #05 Y:2006 | 05 | 2006 | Add additional production shift | $337,500 | $5,000 | |
| LM0116 #04 Y:2006 | 04 | 2006 | Utilize higher efficiency lamps and/or ballasts | $230,613 | $69,350 | |
| LM0116 #03 Y:2006 | 03 | 2006 | Recharge batteries on during off-peak demand periods | $2,913 | $7,000 | |
| LM0116 #02 Y:2006 | 02 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $111,472 | $82,700 | |
| LM0116 #01 Y:2006 | 01 | 2006 | Reschedule plant operations or reduce load to avoid peaks | $12,946 | - |