Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Cheese manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0404 #12 Y:2011 Recover waste heat from equipment $3,982 $20,358
SF0404 #11 Y:2011 Utilize higher efficiency lamps and/or ballasts $10,910 $55,222
SF0404 #10 Y:2011 Install timers on light switches in little used areas $676 $1,569
SF0404 #09 Y:2011 Install compressor air intakes in coolest locations $483 $901
SF0404 #08 Y:2011 Install occupancy sensors $697 $1,356
SF0404 #07 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $6,681 $5,213
SF0404 #06 Y:2011 Modify refrigeration system to operate at a lower pressure $16,688 $12,500
SF0404 #05 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $5,812 $2,778
SF0404 #04 Y:2011 Install / repair insulation on steam lines $17,934 $5,426
SF0404 #03 Y:2011 Reduce illumination to minimum necessary levels $257 $22
SF0404 #02 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $2,243 -
SF0404 #01 Y:2011 Operate boilers on high fire setting $2,708 -
LM0116 #06 Y:2006 Turn off equipment when not in use $260 -
LM0116 #05 Y:2006 Add additional production shift $337,500 $5,000
LM0116 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $230,613 $69,350
LM0116 #03 Y:2006 Recharge batteries on during off-peak demand periods $2,913 $7,000
LM0116 #02 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $111,472 $82,700
LM0116 #01 Y:2006 Reschedule plant operations or reduce load to avoid peaks $12,946 -