Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Cheese manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0132 #11 Y:2019 Upgrade controls on compressors $14,577 $12,760
BS0132 #10 Y:2019 Install vinyl strip / high speed / air curtain doors $682 $1,005
BS0132 #09 Y:2019 Improve air circulation with destratification fans / other methods $10,840 $16,194
BS0132 #08 Y:2019 Avoid frost formation on evaporators $3,938 $2,781
BS0132 #07 Y:2019 Repair or replace steam traps $6,466 $6,828
BS0132 #06 Y:2019 Install occupancy sensors $5,715 $8,435
BS0132 #05 Y:2019 Use most efficient type of electric motors $19,164 $15,537
BS0132 #04 Y:2019 Upgrade controls on compressors $11,835 $21,198
BS0132 #03 Y:2019 Operate boilers on high fire setting $51,880 -
BS0132 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $2,999 $680
BS0132 #01 Y:2019 Upgrade controls on compressors $21,247 $10,080
BS0037 #07 Y:2014 Isolate hot or cold equipment $26 $21
BS0037 #06 Y:2014 Install vinyl strip / high speed / air curtain doors $674 $575
BS0037 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $330 $1,042
BS0037 #04 Y:2014 Utilize higher efficiency lamps and/or ballasts $517 $2,038
BS0037 #03 Y:2014 Insulate glazing, walls, ceilings, and roofs $1,015 $4,060
BS0037 #02 Y:2014 Eliminate or reduce compressed air usage $1,804 $3,120
BS0037 #01 Y:2014 Install / repair insulation on steam lines $108 $540
UU0079 #06 Y:2005 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $284,540 $3,000,000
UU0079 #05 Y:2005 Install occupancy sensors $340 $1,380