Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Dried and dehydrated food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0285 #10 Y:2025 Install occupancy sensors $3,820 $17,670
UU0285 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $8,110 $41,570
UU0285 #08 Y:2025 Pay bills on time to avoid late fees $694 $720
UU0285 #07 Y:2025 Reduce fluid flow rates $2,210 $30,850
UU0285 #06 Y:2025 Eliminate or reduce compressed air usage $2,160 $1,440
UU0285 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,700 $2,950
UU0285 #04 Y:2025 Install common header on compressors $23,050 $394,000
UU0285 #03 Y:2025 Use optimum size and capacity equipment $1,950 $24,760
UU0285 #02 Y:2025 Eliminate or reduce compressed air usage $1,860 $400
UU0285 #01 Y:2025 Use solar heat to make electricty $31,860 $229,735
UU0264 #11 Y:2024 Replace fossil fuel equipment with electrical equipment $44,506 $432,000
UU0264 #10 Y:2024 Utilize energy-efficient belts and other improved mechanisms $515 $916
UU0264 #09 Y:2024 Use solar heat to make electricty $44,517 $717,537
UU0264 #08 Y:2024 Install occupancy sensors $538 $1,531
UU0264 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,405 $8,915
UU0264 #06 Y:2024 Eliminate or reduce compressed air usage $1,905 $7,317
UU0264 #05 Y:2024 Upgrade controls on compressors $3,332 $4,000
UU0264 #04 Y:2024 Replace boiler $379,077 $4,080,441
UU0264 #03 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $729,671 $3,645,455
UU0264 #02 Y:2024 Preheat boiler makeup water with waste process heat $215,672 $730,950