Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen specialty food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0605 #08 Y:2026 Install vinyl strip / high speed / air curtain doors $1,230 $4,746
SU0605 #07 Y:2026 Conserve energy by efficient use of vending machines $104 $187
SU0605 #06 Y:2026 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $801 $1,268
SU0605 #05 Y:2026 Install / repair insulation on steam lines $266 $408
SU0605 #04 Y:2026 Use or replace with energy efficient substitutes $404 $303
SU0605 #03 Y:2026 Reduce space conditioning during non-working hours $9,917 $200
SU0605 #02 Y:2026 Eliminate/reduce an operation $51 -
SU0605 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $5,844 -
SU0535 #12 Y:2023 Install vinyl strip / high speed / air curtain doors $1,120 $4,722
SU0535 #11 Y:2023 Install occupancy sensors $137 $394
SU0535 #10 Y:2023 Conserve energy by efficient use of vending machines $710 $1,538
SU0535 #09 Y:2023 Utilize higher efficiency lamps and/or ballasts $351 $440
SU0535 #08 Y:2023 Eliminate or reduce compressed air usage $1,150 $812
SU0535 #07 Y:2023 Reduce ventilation air $7,133 $882
SU0535 #06 Y:2023 Use or replace with energy efficient substitutes $920 $80
SU0535 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,215 $264
SU0535 #04 Y:2023 Recover waste heat from equipment $7,559 $291
SU0535 #03 Y:2023 Eliminate or reduce compressed air usage $2,371 -
SU0535 #02 Y:2023 Reduce space conditioning during non-working hours $196 -
SU0535 #01 Y:2023 Pay bills on time to avoid late fees $4,903 -