Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

451

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0872 #03 Y:2010 Utilize higher efficiency lamps and/or ballasts $4,954 $19,633
GT0872 #02 Y:2010 Use synthetic lubricant $9,230 -
GT0872 #01 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $960 $1,300
SF0374 #19 Y:2009 Recover and reuse cooling water $23,524 $15,018
SF0374 #18 Y:2009 Use heat from boiler blowdown to preheat boiler feed water $16,622 $86,476
SF0374 #17 Y:2009 Replace hydraulic / pneumatic equipment with electric equipment $89,029 $326,072
SF0374 #16 Y:2009 Utilize higher efficiency lamps and/or ballasts $9,002 $318
SF0374 #15 Y:2009 Analyze flue gas for proper air/fuel ratio $13,809 $31,988
SF0374 #14 Y:2009 Install occupancy sensors $701 $1,567
SF0374 #13 Y:2009 Use optimum size and capacity equipment $2,217 $4,719
SF0374 #12 Y:2009 Utilize energy-efficient belts and other improved mechanisms $2,489 $4,385
SF0374 #11 Y:2009 Use most efficient type of electric motors $3,553 $5,659
SF0374 #10 Y:2009 Use photocell controls $18,403 $18,196
SF0374 #09 Y:2009 Utilize controls to operate equipment only when needed $51,835 $40,007
SF0374 #08 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $48,237 $33,968
SF0374 #07 Y:2009 Modify refrigeration system to operate at a lower pressure $17,939 $12,500
SF0374 #06 Y:2009 Install adequate dryers on air lines to eliminate blowdown $15,888 $9,574
SF0374 #05 Y:2009 Install timers on light switches in little used areas $5,402 $3,037
SF0374 #04 Y:2009 Utilize controls to operate equipment only when needed $9,963 $2,837
SF0374 #03 Y:2009 Reduce excessive boiler blowdown $10,627 $2,372