Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

451

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0210 #12 Y:2011 Turn off equipment when not in use $5,455 $2,425
MI0210 #11 Y:2011 Utilize higher efficiency lamps and/or ballasts $8,145 $8,889
MI0210 #10 Y:2011 Use radiant heater for spot heating $8,346 $10,000
MI0210 #09 Y:2011 Heat water with exhaust heat $16,131 $30,000
MI0210 #08 Y:2011 Install / repair insulation on steam lines $16,463 $16,554
MI0210 #07 Y:2011 Utilize controls to operate equipment only when needed $17,851 $20,000
MI0210 #06 Y:2011 Clean or color roof to reduce solar load $18,125 $133,000
MI0210 #05 Y:2011 Use waste heat from hot flue gases to preheat $18,730 $26,000
MI0210 #04 Y:2011 Analyze flue gas for proper air/fuel ratio $20,342 $1,350
MI0210 #03 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $24,805 $1,320
MI0210 #02 Y:2011 Install vinyl strip / high speed / air curtain doors $39,559 $7,338
MI0210 #01 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $64,568 $175,700
SF0399 #14 Y:2011 Adopt in-house material generation $38,710 $49,256
SF0399 #13 Y:2011 Size electric motors for peak operating efficiency $11,038 $65,479
SF0399 #12 Y:2011 Install occupancy sensors $5,862 $26,604
SF0399 #11 Y:2011 Size electric motors for peak operating efficiency $18,286 $77,335
SF0399 #10 Y:2011 Use heat from boiler blowdown to preheat boiler feed water $6,800 $37,014
SF0399 #09 Y:2011 Utilize higher efficiency lamps and/or ballasts $78,758 $307,524
SF0399 #08 Y:2011 Modify refrigeration system to operate at a lower pressure $31,982 $112,500
SF0399 #07 Y:2011 Insulate bare equipment $1,028 $4,855