Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Malt manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0521 #06 Y:2006 Recharge batteries on during off-peak demand periods $1,035 $500
WI0521 #05 Y:2006 Install compressor air intakes in coolest locations $1,630 $3,200
WI0521 #04 Y:2006 Use waste heat from hot flue gases to preheat $5,386 $11,000
WI0521 #03 Y:2006 Modify refrigeration system to operate at a lower pressure $6,900 $18,000
WI0521 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $9,408 $13,600
WI0521 #01 Y:2006 Utilize other methods to remove contaminants $222,888 $230,600
OR0494 #15 Y:2005 Turn off equipment when not in use $7,580 $19,700
OR0494 #14 Y:2005 Modify process to reduce material use/cost $107,700 $340,000
OR0494 #13 Y:2005 Utilize higher efficiency lamps and/or ballasts $22,800 $49,400
OR0494 #12 Y:2005 Upgrade obsolete equipment $1,100 $1,300
OR0494 #11 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $6,400 $6,500
OR0494 #10 Y:2005 Upgrade controls on compressors $3,500 $2,320
OR0494 #09 Y:2005 Reduce fluid flow rates $2,400 -
OR0494 #08 Y:2005 Eliminate or reduce compressed air usage $1,100 -
OR0494 #07 Y:2005 Make a practice of turning off lights when not needed $2,400 -
OR0494 #06 Y:2005 Reduce the pressure of compressed air to the minimum required $5,100 -
OR0494 #05 Y:2005 Analyze flue gas for proper air/fuel ratio $55,000 $3,100
OR0494 #04 Y:2005 Redesign flow to minimize mass transfer length $36,800 $1,400
OR0494 #03 Y:2005 Reduce fluid flow rates $54,700 $630
OR0494 #02 Y:2005 Reduce fluid flow rates $63,500 -