47
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Malt manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WI0521 #06 Y:2006 | 06 | 2006 | Recharge batteries on during off-peak demand periods | $1,035 | $500 | |
| WI0521 #05 Y:2006 | 05 | 2006 | Install compressor air intakes in coolest locations | $1,630 | $3,200 | |
| WI0521 #04 Y:2006 | 04 | 2006 | Use waste heat from hot flue gases to preheat | $5,386 | $11,000 | |
| WI0521 #03 Y:2006 | 03 | 2006 | Modify refrigeration system to operate at a lower pressure | $6,900 | $18,000 | |
| WI0521 #02 Y:2006 | 02 | 2006 | Utilize higher efficiency lamps and/or ballasts | $9,408 | $13,600 | |
| WI0521 #01 Y:2006 | 01 | 2006 | Utilize other methods to remove contaminants | $222,888 | $230,600 | |
| OR0494 #15 Y:2005 | 15 | 2005 | Turn off equipment when not in use | $7,580 | $19,700 | |
| OR0494 #14 Y:2005 | 14 | 2005 | Modify process to reduce material use/cost | $107,700 | $340,000 | |
| OR0494 #13 Y:2005 | 13 | 2005 | Utilize higher efficiency lamps and/or ballasts | $22,800 | $49,400 | |
| OR0494 #12 Y:2005 | 12 | 2005 | Upgrade obsolete equipment | $1,100 | $1,300 | |
| OR0494 #11 Y:2005 | 11 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,400 | $6,500 | |
| OR0494 #10 Y:2005 | 10 | 2005 | Upgrade controls on compressors | $3,500 | $2,320 | |
| OR0494 #09 Y:2005 | 09 | 2005 | Reduce fluid flow rates | $2,400 | - | |
| OR0494 #08 Y:2005 | 08 | 2005 | Eliminate or reduce compressed air usage | $1,100 | - | |
| OR0494 #07 Y:2005 | 07 | 2005 | Make a practice of turning off lights when not needed | $2,400 | - | |
| OR0494 #06 Y:2005 | 06 | 2005 | Reduce the pressure of compressed air to the minimum required | $5,100 | - | |
| OR0494 #05 Y:2005 | 05 | 2005 | Analyze flue gas for proper air/fuel ratio | $55,000 | $3,100 | |
| OR0494 #04 Y:2005 | 04 | 2005 | Redesign flow to minimize mass transfer length | $36,800 | $1,400 | |
| OR0494 #03 Y:2005 | 03 | 2005 | Reduce fluid flow rates | $54,700 | $630 | |
| OR0494 #02 Y:2005 | 02 | 2005 | Reduce fluid flow rates | $63,500 | - |