Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Dog and cat food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0539 #05 Y:2015 Reduce the pressure of compressed air to the minimum required $976 $200
IA0539 #04 Y:2015 Install occupancy sensors $1,043 $2,270
IA0539 #03 Y:2015 Use most efficient type of electric motors $2,119 $3,351
IA0539 #02 Y:2015 Utilize higher efficiency lamps and/or ballasts $2,398 $11,616
IA0539 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $7,958 $23,028
MZ0185 #06 Y:2015 Use photocell controls $30,214 $15,000
MZ0185 #05 Y:2015 Utilize a less expensive cooling method $92,880 $450,000
MZ0185 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $5,296 $9,730
MZ0185 #03 Y:2015 Lower temperature during the winter season and vice-versa $16,223 -
MZ0185 #02 Y:2015 Clean or color roof to reduce solar load $4,593 $7,228
MZ0185 #01 Y:2015 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $444,193 $2,686,745
SU0330 #04 Y:2012 Conserve energy by efficient use of vending machines $136 $538
SU0330 #03 Y:2012 Optimize plant power factor $10,402 $39,967
SU0330 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $8,383 $7,475
SU0330 #01 Y:2012 Repair or replace steam traps $113,612 $32,250
LE0319 #05 Y:2011 Meter waste water $10,797 $3,240
LE0319 #04 Y:2011 Operate boilers on high fire setting $16,771 -
LE0319 #03 Y:2011 Reduce the pressure of compressed air to the minimum required $22,751 $160
LE0319 #02 Y:2011 Utilize energy-efficient belts and other improved mechanisms $30,212 $5,424
LE0319 #01 Y:2011 Minimize water usage $66,284 $168,000