ITAC Assessment: IA0539
ITAC logo
ITAC Assessment: IA0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Pet Food
NAICS 311111: Dog and Cat Food Manufacturing
SIC 2047: Dog and Cat Food
Sales Range $100
M
to 500
M
# of Employees 216
Plant Area 250,000
ft2
Annual Production 150,000
ton
Production Hrs. Annual 6,960
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $664,357 15,362,300
kWh
Electricity Demand $186,290 30,824
kW-mo/yr
Electricity Fees $3,470 -
Natural Gas $583,180 147,190
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,451

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,958 $23,028 $6,437
145,951
kWh
$1,521
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,398 $11,616 $2,398
54,376
kWh
-
03 2.4133: Use most efficient type of electric motors $2,119 $3,351 $1,690
38,316
kWh
$429
-
kW-mo/yr
04 2.7135: Install occupancy sensors $1,043 $2,270 $1,043
23,666
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $976 $200 $780
17,690
kWh
$196
-
kW-mo/yr
TOTAL RECOMMENDED $14,494 $40,465 $12,348
279,999
kWh
$2,146
-
kW-mo/yr
TOTAL IMPLEMENTED $13,451 $38,195 $11,305
256,333
kWh
$2,146
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs